Primary position 16 mm

770 تومان880 تومان

SKU: N/A Category:

Description

Primary position 16 mm

Primary position 16 mm In drip irrigation, there are 2 methods to get a branch from the water pipes to connect to the 16 or 20 mm pipe. One is the use of polyethylene belt and riser and the other is the initial pressure clamp of 16 mm with silicone gasket.

The second method is much more cost-effective if implemented correctly than the gasket.

Installation How to install

First, they choose a polyethylene pipe that they want using a drill proportional to the droplets of gaskets and clamps. First, considering that there are a variety of gaskets and clamps in the market on a multi-hole pipe meter with several drill models in the size of the gasket, you know the creation and gasket clamps on them to try.

In the past, gaskets of 12 and 16 positions that were small were used. Today, gaskets and clamps are mostly produced in sizes 18, which causes Bicester to be watered on 16 lines.

Silicon washer type should also be carefully performed.

Primary clamp 16*12 is the most widely used in babler and drip irrigation and milk method 16 in pistachio orchards and other trees.

The first method:

As you are sure, one of the irrigation methods for saline water is to use babylons with an output of 30 liters per hour, 75 liters per hour or 130 liters per hour. For water supply, lateral (32 mm pipe with pressure of 6 or 8 atmospheres) is usually used. Considering that the base of some boblers is 12 mm or 16 mm, gasket 12 and with primary clamp 12*12 or initial clamp 12*16 is used.

Since in pistachio orchards farmers often use bobler with a discharge of 75 liters per hour, so this connection and gasket is the most widely used in pistachio orchards.

Second method:

If the water used in irrigation has a high EC (salinity coefficient). (8000 and up)

In addition to babylon, milk 16 or 12 is also used at the foot of trees.

Additional information

Size

3/8*16, 5/8*16

Reviews

There are no reviews yet.

Be the first to review “Primary position 16 mm”

Your email address will not be published. Required fields are marked *